4.8 MW Hydroelectric Facility
Montrose, CO
The project at Drop 4 included a 1,360 feet of 120 inch diameter steel penstock and a 4.8MW turbine generator. Drop 4 had adequate space to excavate the powerhouse slopes while adding steps to stabilize the slopes. This included treating the slopes with a product to seal the soil surface and help prevent erosion.
Commissioned Spring 2015.